Construction Of A Biomass Boiler With A Nominal Power Of 10 Mw At The Heat Management Plant In Oleśnica

Miejska Gospodarka Komunalna Spolka z o.o. Poland has Released a tender for Construction Of A Biomass Boiler With A Nominal Power Of 10 Mw At The Heat Management Plant In Oleśnica in . The tender was released on Jun 05, 2024.

Country - Poland

Summary - Construction Of A Biomass Boiler With A Nominal Power Of 10 Mw At The Heat Management Plant In Oleśnica

Deadline - login to view

GT reference number - 82609313

Product classification - Hot-water boilers

Organization Details:

  Address - Poland

  Contact details - 565656565

  Tender notice no. - 76454545

  GT Ref Id - 82609313

  Document Type - Tender Notices

Notice Details and Documents:

Description - Description: The subject of the order is the construction of a biomass boiler with a nominal power of 10 MW, called the Biomass Boiler House in the documentation. A biomass boiler room should enable effective operation of the biomass combustion descr ibed in the fuel characteristics at variable load from 40% to 100%, without the need to stop and start the installation and without turning off the flue gas dedusting system. After its durability period, after installing an additional flue gas purification system, the biomass boiler should enable co-combustion of contaminated wood biomass that requires thermal transformation. The Ordering Party has the Decision of the Oleśnica Starosta No. AB 67

Gt Ref Id - 82609313

Deadline - Aug 08, 2024

Share share

Similar Tenders :